Water and Wastewater Treatment Projects >MidCoast Council Sewage Treatment UV Upgrades

MidCoast Council Sewage Treatment UV Upgrades

Lansdowne, Coopernook, Manning Point & Stroud, NSW

View All Projects
Project Overview

Multi-Site UV Disinfection Upgrades for MidCoast Council

MidCoast Council required UV disinfection upgrades across four sewage treatment plants to improve system reliability and maintain compliance with wastewater discharge requirements. Existing UV systems were approaching end of life and required replacement with modern, energy-efficient technology.

FILTEC was engaged as lead contractor to design, supply and install Wedeco LBX UV systems, including full integration with existing infrastructure. The upgrades were delivered across live, operational sites, requiring careful staging and coordination to minimise disruption while ensuring safe and compliant outcomes.

The Challenge

Delivering UV Upgrades Across Live Brownfield Sites

The project involved upgrading UV systems across multiple operational sewage treatment plants, each with site-specific constraints and ageing infrastructure. Key challenges included:

  • Integration with existing pipework and controls

  • Installation within confined plant spaces

  • Maintaining operation during works

  • Managing long equipment lead times

  • Safe delivery across active sites

The upgrades required a flexible, well-coordinated approach to minimise operational risk while achieving consistent outcomes across all locations.

The Solution

Wedeco LBX UV System Replacement and Integration

FILTEC delivered UV system upgrades using Wedeco LBX technology, selected for its wastewater disinfection performance and suitability for retrofit applications. The upgrade scope included:

  • Removal of existing UV systems

  • Installation of Wedeco LBX units

  • Stainless steel pipework connections

  • UV control cabinet installation

  • PLC integration via Ethernet/IP

The upgraded systems provide reliable UV disinfection and compatibility with existing plant infrastructure.

Brownfield Installation and Coordinated Delivery

Works were undertaken within existing treatment plant structures, often in restricted spaces adjacent to operating equipment. FILTEC coordinated closely with subcontract partners to maintain site safety and operational continuity during installation.

  • Installation within existing plant buildings

  • Coordination with subcontractors

  • Staged cutovers to maintain operation

  • Mechanical and electrical integration

  • Site-specific delivery across four sites

A coordinated delivery approach ensured safe execution and consistent quality across all sites.

Commissioning and Ongoing UV Servicing

Commissioning activities were undertaken to verify system performance and ensure readiness for operation across all sites.

  • Functional system testing

  • PLC communication verification

  • Electrical and instrumentation checks

  • Proof of Performance testing

Operator training was provided to support effective use and maintenance of the UV systems. FILTEC continues to provide ongoing UV servicing across all sites, including lamp replacement, quartz sleeve cleaning, sensor calibration, and preventative maintenance.

The Result

Reliable, Modernised UV Disinfection Across Four Sites

The MidCoast Council UV upgrade project delivers:

  • Replacement of ageing UV systems

  • Improved disinfection reliability

  • Integration with existing infrastructure

  • Safe delivery in live environments

  • Verified performance across all sites

Through coordinated multi-site delivery, the project strengthens operational reliability and supports ongoing compliance across MidCoast Council’s wastewater treatment network.