Casterton Water Treatment Plant Lamella Clarifier Upgrade

Casterton, Victoria

View All Projects
Project Overview

Upgrading Drinking Water Clarification at Casterton

Wannon Water required a new lamella plate clarifier and associated infrastructure at Casterton Water Treatment Plant. This water treatment plant clarifier upgrade had to integrate with the operating treatment process while coordinating mechanical, civil, electrical and automation works.

As main contractor, FILTEC completed the process and mechanical design, fabrication, installation, testing and commissioning of the 270 m³/hr upgrade. The scope included a sludge removal system, instrumentation and PLC/SCADA integration with the wider plant.

The Challenge

Integrating a Lamella Clarification System into an Existing Plant

The new lamella clarification system needed to be installed within an established water treatment plant, with interfaces across the treatment process and site infrastructure. Key requirements included:

  • New lamella plate clarifier

  • Sludge removal and process pipework

  • Inlet, outlet, overflow and sludge tie-ins

  • Concrete works, walkways and site access

  • PLC and SCADA integration

Delivery required close coordination between the new clarification infrastructure and the plant’s existing operation.

The Solution

In-House Process and Mechanical Delivery

FILTEC designed the process and mechanical works in-house, then fabricated and installed the core mechanical scope through its own fabrication team. This created continuity from design through to commissioning.

The mechanical works included:

  • Lamella plate clarifier

  • Sludge removal system

  • Pipework, valves and fittings

  • Process tie-ins and sampling connections

  • Hydraulic control modifications

Supporting civil works included reinforced concrete structures, walkways, fencing reinstatement and a new access track.

Water Treatment PLC and SCADA Integration

FILTEC coordinated the civil, electrical and automation interfaces required for the completed upgrade.

The works included:

  • Turbidity and pH monitoring

  • Flocculation tank level switches

  • Clarifier sludge flow measurement

  • PLC and SCADA integration

  • Access lighting

FILTEC also provided testing, commissioning, operation and maintenance manuals, and as-constructed drawings.

The Result

A Compliant, Resilient Drinking Water Supply for Fairlie

FILTEC delivered and commissioned a new 270 m³/hr lamella plate clarifier, integrating the new system with Casterton Water Treatment Plant’s existing infrastructure and controls.

The completed Wannon Water treatment plant upgrade provided:

  • Lamella clarification and sludge removal

  • Mechanical fabrication and installation

  • Civil, electrical and automation coordination

  • Process monitoring instrumentation

  • Integrated PLC and SCADA controls

  • Commissioning and handover documentation

The project demonstrates FILTEC’s capability to lead multi-disciplinary clarification upgrades within operating water treatment plants.