Mataura Water Treatment Plant Upgrade

Southland, New Zealand

View All Projects
Mataura Water Treatment Plant following refurbishment works completed for Gore District Council
Project Overview

Extending the Life of a Critical Community Water Asset

The Mataura Water Treatment Plant had supplied drinking water to the community since 1963, with much of its infrastructure and equipment approaching the end of its operational life. Gore District Council required a practical upgrade solution that would maintain compliance, improve reliability and extend the life of the existing facility while future regional water supply options were evaluated.

FILTEC delivered a comprehensive brownfield refurbishment incorporating filtration, mechanical, electrical and automation upgrades. The project modernised critical plant infrastructure while maintaining uninterrupted drinking water supply throughout construction.

The Challenge

Upgrading a Live Plant Without Interrupting Supply

Unlike greenfield projects, the Mataura upgrade required major refurbishment works to be completed within an operational drinking water treatment plant serving the local community. The project required:

  • Continuous water supply during construction

  • Integration with ageing infrastructure

  • Staged shutdowns and tie-ins

  • Drinking water compliance

  • Safe management of site hazards

Work sequencing remained highly dependent on plant operating conditions and available source water capacity throughout the programme.

The Solution

GAC Filtration and Process Infrastructure Upgrades

FILTEC delivered upgrades across multiple treatment process areas to improve reliability and extend asset life. Key works included:

  • Triton stainless-steel underdrain system

  • Filter floor and media retention upgrades

  • Air scour integration

  • Mechanical equipment upgrades

  • New switchboard and electrical systems

  • Process control upgrades

The works modernised critical treatment infrastructure while integrating with existing plant operations.

Triton stainless-steel underdrain system installed at Mataura Water Treatment Plant

Brownfield Delivery in an Operational Environment

Construction was undertaken within a fully operational treatment plant, requiring close coordination with Gore District Council operators and Beca.

  • Detailed shutdown and isolation planning

  • Integration with legacy pipework and assets

  • Stakeholder coordination

  • Flexible programme sequencing

  • Local subcontractor engagement

Extended dry weather delayed access to key treatment assets, requiring work fronts to be resequenced while maintaining programme progress.

Managing Risk, Quality and Plant Performance

The project involved several high-risk work areas requiring specialist management and careful quality control.

  • Chemical residue neutralisation works

  • Asbestos identification and removal

  • Hold-point inspections and approvals

  • Performance verification testing

  • Operator training and handover

Regular inspections and collaborative planning ensured upgrade works met operational, safety and quality expectations before returning assets to service.

Chemical dosing system installed during the Mataura Water Treatment Plant upgrade
The Result

A Modernised Water Treatment Plant for Mataura

The upgraded Mataura Water Treatment Plant now provides:

  • Extended operational asset life

  • Improved treatment reliability

  • Modern electrical and control systems

  • Enhanced filtration infrastructure

  • Continued drinking water compliance

By successfully delivering complex upgrades within a live treatment plant, FILTEC helped Gore District Council modernise a critical community asset while maintaining uninterrupted supply and supporting long-term operational resilience.

Upgraded chemical dosing and process control equipment within a drinking water treatment plant