The Tasman District Council required a water treatment system that provided water quality improvements for household usage. The solution needed to make use of the existing water source while improving the quality of water delivered. FILTEC designed and installed a tube settler lamella clarifier along with a self-cleaning filter.
Continue readingElimination of contamination in household water supply
The Manawatu District Council required upgrades to the ÅŒhakea water scheme to achieve elimination of contamination in household water supply. FILTEC were responsible for the design and construction of a new 1,500 m3/d water treatment plant. The new plant needed to supply drinking water to residences and farms in the ÅŒhakea rural areas, Sanson and the RNZAF Base.
Continue readingUV Upgrades to Three Water Treatment Plants
FILTEC was awarded the contract to upgrade 3 existing water treatment plants in the Matamata-Piako district, Scott Road (Morrisville), Burwood Road (Matamata) and Tawari Street (Matamata).
Continue readingFrontier Road Water Treatment Plant
This project involved the installation of a containerised UV and chlorine at bore location. This included piping to existing reservoir at the location of the treatment plant, electrical and control works and Bore head civil works.
Continue readingBore Water to Safe Drinking Water – Waharoa
Open Dairy was consented to extract 142.5m³/hr 16/24hrs per day from an onsite bore. The bore water was generally low in turbidity with high iron and Manganese concentration. Filtec was contracted to provide onsite drinking water for the Open Country Dairy Waharoa site.